Exercise: Chain Rule

Questions for: Chain Rule

4 mat-weavers can weave 4 mats in 4 days. At the same rate, how many mats would be woven by 8 mat-weavers in 8 days?
A:
4
B:
8
C:
12
D:
16
Answer: D

Let the required number of bottles be x.

More weavers, More mats (Direct Proportion)

More days, More mats (Direct Proportion)

Wavers 4 : 8 :: 4 : x
Days 4 : 8

4 x 4 x x = 8 x 8 x 4

x = (8 x 8 x 4)
(4 x 4)

x = 16.

36 men can complete a piece of work in 18 days. In how many days will 27 men complete the same work?
A:
12
B:
18
C:
22
D:
24
Answer: D

Let the required number of days be x.

Less men, More days (Indirect Proportion)

27 : 36 :: 18 : x       27 x x = 36 x 18

x = 36 x 18
27

x = 24.

An industrial loom weaves 0.128 metres of cloth every second. Approximately, how many seconds will it take for the loom to weave 25 metres of cloth?
A:
178
B:
195
C:
204
D:
488
Answer: B

Le the required time be x seconds.

More metres, More time (Direct Proportion)

0.128 : 25 :: 1 : x       0.128x = 25 x 1

x = 25 = 25 x 1000
0.128 128

x = 195.31.

Required time = 195 sec (approximately).

In a camp, there is a meal for 120 men or 200 children. If 150 children have taken the meal, how many men will be catered to with remaining meal?
A:
20
B:
30
C:
40
D:
50
Answer: B

There is a meal for 200 children. 150 children have taken the meal.

Remaining meal is to be catered to 50 children.

Now, 200 children 120 men.

50 children 120 x 50 = 30 men.
200

A flagstaff 17.5 m high casts a shadow of length 40.25 m. The height of the building, which casts a shadow of length 28.75 m under similar conditions will be:
A:
10 m
B:
12.5 m
C:
17.5 m
D:
21.25 m
Answer: B

Let the height of the building x metres.

Less lengthy shadow, Less in the height (Direct Proportion)

40.25 : 28.75 :: 17.5 : x       40.25 x x = 28.75 x 17.5

x = 28.75 x 17.5
40.25

x = 12.5

Ad Slot (Above Pagination)
Quiz