Slack may be positive, zero or negative.
A:
Agree
B:
Disagree
C:
D:
Answer: A
No answer description is available. Let's discuss.
Time study is carried out to determine the time required to complete job by
A:
a slow worker
B:
a fast worker
C:
an average worker
D:
an apprentice
Answer: C
No answer description is available. Let's discuss.
According to Muther, the basic principle of best layout is
A:
principle of over-all integration
B:
principle of flow
C:
principle of flexibility
D:
all of these
Answer: D
No answer description is available. Let's discuss.
Normal time is the ratio of representative time to the rating factor.
A:
True
B:
False
C:
D:
Answer: B
No answer description is available. Let's discuss.
The time taken by a trained worker to perform an operation, while working a steady pace, is known as
A:
standard time
B:
normal time
C:
representative time
D:
none of these
Answer: A
No answer description is available. Let's discuss.