Exercise: Industrial Engineering And Production Management

Questions for: Industrial Engineering And Production Management

A feasible solution to the linear programming problem should
A:
satisfy the problem constraints
B:
optimise the objective function
C:
satisfy the problem constraints and non-negativity restrictions
D:
satisfy the non-negativity restrictions
Answer: C
No answer description is available. Let's discuss.
In process layout
A:
handling and back-tracking of materials is too much
B:
production control is more difficult and costly
C:
routing and scheduling is more difficult
D:
all of the above
Answer: D
No answer description is available. Let's discuss.
In perpetual inventory control, the material is checked as it reaches its
A:
maximum value
B:
minimum value
C:
average value
D:
any one of these
Answer: D
No answer description is available. Let's discuss.
Performance rating is equal to
A:
observed performance + normal performance
B:
observed performance - normal performance
C:
observed performance x normal performance
D:
none of the above
Answer: D
No answer description is available. Let's discuss.
In jobbing production
A:
highly skilled workers are needed
B:
unit costs are high
C:
operations are labour-intensive
D:
all of these
Answer: D
No answer description is available. Let's discuss.
Ad Slot (Above Pagination)
Quiz